Identifikasi dan Pengendalian Risiko Dominan pada Proyek Preservasi Jalan Menggunakan Metode HIRA dan HAZOP
Keywords:
HAZOP, HIRA, Pareto Chart, Risk, Road Preservation ProjectAbstract
The road preservation project is one of the infrastructure projects. Infrastructure has many risks and uncertainties in the implementation process. These risks can affect project productivity, quality, and budget. Therefore, it is necessary to plan risk control in project implementation. Risk analysis is done by analyzing project implementation data and giving questionnaires to selected respondents using the HIRA and HAZOP methods. Analysis starts from the planning stage to identify risks, probability and severity index using the HIRA method. Risk variables with dominant risks are selected using the Pareto diagram, and risk responses are prepared using the HAZOP method. The results of risk identification obtained 26 variables. Next, calculations were carried out using the Pareto diagram, getting 17 dominant risks and two high-dominant risk controls to bring nine recommended solutions.
ABSTRAK:
Proyek preservasi jalan merupakan salah satu proyek infrastruktur. Infrastruktur memiliki banyak risiko dan ketidakpastian dalam proses implementasinya. Risiko-risiko ini dapat mempengaruhi produktivitas, kualitas, dan anggaran proyek. Oleh karena itu, perlu direncanakan pengendalian risiko pada pelaksanaan proyek. Analisis risiko dilakukan dengan menganalisis data proyek pelaksanaan proyek, memberikan kuisioner terhadap responden terpilih menggunakan metode HIRA dan HAZOP. Analisis dimulai dari tahap perencanaan untuk mengidentifikasi risiko baik probabilitas maupun indek keparahannya menggunakan metode HIRA. Varibel risiko dipilih yang memiliki risiko dominan menggunakan diagram Pareto dan disusun respon risiko menggunakan metode HAZOP. Hasil identifikasi risiko diperoleh 26 variabel. Selanjutnya perhitungan dilakukan dengan diagram Pareto dan diperoleh 17 risiko dominan dan 2 pengendalian risiko dominan tinggi mendapatkan 9 solusi yang direkomendasikan.
References
W. Wilwin and A. Sutandi, “Studi Identifikasi Risiko Pada Proyek Infrastruktur Di Indonesia,” JMTS J. Mitra Tek. Sipil, vol. 4, no. 1, p. 295, Feb. 2021, doi: 10.24912/jmts.v0i0.10646.
Y. Sopiyah and A. Salimah, “Analisis Dan Respon Risiko Pada Proyek Konstruksi Gedung,” Constr. Mater. J., vol. 2, no. 1, pp. 46–58, 2020, doi: 10.32722/cmj.v2i1.2757.
R. Utama, E. Setyowati, and Harimurti, “Analisis Tingkat Risiko Proyek Pelaksanaan Pemeliharaan Jalan Untuk Meningkatkan Kinerja Mutu Proyek Jalan Di Kabupaten Malang,” Rekayasa Sipil, vol. 11, no. 3, pp. 211–219, 2017, doi: 10.21776/ub.rekayasasipil/2017.011.03.6.
F. Moi and I. G. . N. Purnawirati, “Analisis Manajemen Risiko Pada Proyek Pembangunan Ruas Jalan Baru Waebetu – Tarawaja,” J. Talent. Sipil, vol. 4, no. 1, p. 79, 2021, doi: 10.33087/talentasipil.v4i1.52.
AS/NZS, “Risk Management Guidelines Companion to AS/NZS 4360:2004,” Nature, vol. 428, no. 6983, p. 592, 2004, doi: 10.1038/428592a.
Jasamarga, “Teknik dan Metode Identifikasi dan Analisis Risiko,” Indones. Highw. Corp., pp. 1–53, 2020, [Online]. Available: http://app.jasamarga.co.id/bmmr/library/assets/01b.pdf
PMBOK®, & Guide. (2000). Project Management Body of Knowledge Project Management Body of Knowledge.
Ratnaningsih, A., Arifin, S., Suyoso, H., Trisiana, A., & Azkha Yusuf, N. (2019). Risk Assessment On Occupational Accident Of Apartment Building Structural Work With Failure Mode And Effect Analysis (FMEA) Method. MATEC Web Of Conferences, 276. https://doi.org/10.1051/matecconf/201927602016
I. A. Alfarezi, J. W. Soetjipto, and S. Arifin (2021), “Analisis Risiko Keselamatan Dan Kesehatan Kerja (K3) Pada Masa Pandemi Covid-19 Dengan Metode Bowtie Analysis,” J. Tek. Sipil, vol. 10, no. 2, pp. 96–105, 2021, doi: 10.24815/jts.v10i2.21923.
R.T. Wardhana, J.W. Soetjipto, and A. Ratnaningsih (2015), Analisis Risiko Keselamatan dan Kesehatan Kerja (K3) Dengan Metode Hazard Analysis (Studi Kasus pada Proyek Pembangunan Gedung Marvell City Surabaya), Skripsi S1 Teknik Sipil Univesitas Jember.
J. W. Soetjipto, O. H. U. Haq, and S. Arifin (2020), “Asesmen Pelaksanaan Kesehatan dan Keselamatan Kerja pada Proyek Konstruksi dan Sistem Pengambilan Keputusan Menggunakan Metode Fault Tree Analysis,” Bina Ketenagakerjaan, vol. 2, no. 2, pp. 133–147, 2020.
PP RI. (2006). Jalan. 34.
Downloads
Published
Issue
Section
License
Copyright (c) 2023 IAMPI - Universitas Jember
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.